W  e  l  c  o  m  e
download COVID-19 Office Prep guide here

Technology Continues to Improve Safety on Construction Sites


Brokk Robot 160

Improving safety and efficiency continues to be a priority at BIG. Earlier this month, our project team used the Brokk 160 robot to demo through two-floors to install an interstitial stair at Emergency Nurses Association new office building. This type of robot saves time, improves efficiency and reduces safety risk. Controlled by a human operator, the operator can stand up to thirty (30) feet away from the demolition site while remaining in control and safe throughout the entire process. The robot can cut straight up and, on an angle, improving the quality of demolition. The robot also outpaces the productivity of four to five laborers’ work volume in one day.

We are currently working with the Emergency Nurses Association to renovate the 40,000-square-foot office building they purchased in Schaumburg, IL. Once complete, the new office building will feature open office workspaces, a multi-purpose area, conference center, and boardroom. We are partnering with interior design firm, BOX Studios and owner's representative, Savills Studley.

Tips & Tricks

Schedule Maintenance Strategies to Mitigate Current Supply Chain Constraints

As we enter Q2 of 2023, we expect supply chain challenges and increases in construction costs to persist.

BY
BIG Construction
April 22, 2019
Tips & Tricks

Construction Considerations When Subleasing Office Space

A run-down of sublease considerations from a construction perspective.

BY
BIG Construction
April 22, 2019
Tips & Tricks

Five Focuses for Dry Lab Construction

Important considerations for life sciences construction.

BY
BIG Construction
April 22, 2019

LET’S MAKE it Happen